The CPFC requires infrastructure upgrades to its cleanroom recirculation units to improve operational efficiency and facility process control. To ensure equipment longevity, warranty protection, and correct system integration, the new VFDs must be supplied alongside professional, factory-certified commissioning services. These new VFDs must also be able to be installed onto existing recirc units and tied into the Building Automation System (BAS).