The NCC is seeking qualified proponent for the rehabilitation of the bridges is required to extend their lives by at least 30 years. Scope of work includes
but is not limited to:
1. Partial depth concrete removals and repairs on abutments, wing walls, bearing seats, soffits, fascia, deck, and deck ends
2. Remove and replace concrete curbs, sidewalks, and curtain walls
3. Remove existing railings and install new crash tested railings
4. Replace waterproofing system and asphalt pavements
5. Replace bearings
6. Replace approach slabs
7. Repair flagstone slope protection