John Palmour Advanced Manufacturing Center
A 445-acre ($5 billion), 2.5 million SQFT, manufacturing plant housed at the Chatham Advanced Manufacturing site to produce silicon carbide wafers, the building blocks of semiconductors. • Develop, implement and maintain a Primavera (P6) resource loaded and CMP schedule. • Illustrate a complete EPC Path of Construction. Integrating Engineering, Procurement and Construction vendors into one schedule. • Developed a Power BI App (Interactive Metrics Dashboard) incorporating interactive Synoptic Mapping
- Siler City North Carlolina
- Submitted by Tony Gale
- $4800000000